Signing and Installation of Self-insulated Block Production Line for Russian Client

Author: Release time: 2025-09-15 11:57:37 View number: 140

Project Name
Self-insulated block production line construction project for Russian customers

Project time
December 2024

Project Background
Demand for energy-saving building materials continues to grow in Russia, and self-insulated blocks are attracting widespread attention due to their excellent thermal insulation and environmental characteristics. Based on the need to improve product quality and production efficiency, the client is looking for an automated and customized production line solution to enhance the competitiveness of the local market.

Customer Needs
The client's core requirements included:

  1. Customized equipment configurations to match local production scale and process standards

  2. Automation system to cover the whole process of dosing, mixing, pouring and cutting.

  3. Efficient and environmentally friendly equipment that meets the requirements of Russian construction material production.

  4. Provide professional installation and commissioning and production technology guidance.

  5. Establish long-term and stable technical support and after-sales service mechanism

Project Overview
This project is a complete self-insulated block production line, covering automatic metering, mixing, pouring and cutting systems, with a high degree of automation and flexibility, which can be adjusted according to the actual production needs of customers, taking into account the efficiency and product quality.

Cooperation Process
Our company promotes project cooperation in stages:

  1. Customer site visits, in-depth communication of production requirements and technical details

  2. Customized automation equipment configuration to ensure that it meets the customer's production scale and process requirements.

  3. Completion of equipment manufacturing and factory testing, and arrangement of international logistics shipments to Russia.

  4. Dispatch professional technical team to the site for equipment installation and commissioning

  5. Carry out local operator training, provide production guidance and technology transfer

Project Effect
The project is progressing in an orderly manner and the following milestones have been realized:

  1. The equipment has been successfully delivered to the customer's site and entered the installation and commissioning stage.

  2. The customized system effectively matches the customer's production requirements and site conditions.

  3. The project has deepened our cooperation base in the Russian market.

  4. Laying a solid foundation for the customer to realize efficient and environmentally friendly localized production.